[3D Panoramic Scanning] How to Simplify As-Built Drawing Processes? The Unmissable Advantages of Space Scanning!

 
Easily Create As-Built Drawings with Digital Twins

As the saying goes, even the most thorough construction management plan can quickly go awry. While your team can spend countless hours designing a structure or planning a renovation, it only takes one day for unexpected challenges to arise, leading to a significant difference between design and as-built. Accurate as-built drawings ensure the entire process, challenges and all, is completed correctly, avoiding confusion later on.

Unfortunately, the difficulties in handling as-built drawings often lead to unfavorable situations. From communication problems to outdated technology, many challenges can result in rushed or incomplete as-built drawings during the construction process.

Whether you're undertaking a renovation or constructing a site from scratch, accurate as-built drawings can not only benefit you in many ways but also be easily put together!

👉 [Related Article]: Common Challenges & 6 Ways to Overcome Them - Accelerate Project Efficiency with Spatial Scanning Technology 

 

What are As-Built Drawings?
As-built drawings, or redline drawings, are part of the竣工文件 (completion documents) that accurately illustrate how a structure was built, rather than how it was designed. If any changes were made to the original plans during construction, the as-built drawings should reflect these design changes. Ideally, as-built drawings and completion documents should also include a detailed log of the reasons for changes and supplementary notes.

Before drafting the final as-built drawings, an as-built survey is usually conducted. During this process, the contractor or architect will conduct a thorough investigation and record the locations of utilities, the height and dimensions of surfaces, etc. Surveyors will also note any deviations from blueprints or construction plans to the existing conditions of the structure.

Ultimately, anyone reviewing the as-built drawings should be able to understand the specifications of the structure or site, and why any changes were made.

 


6 Things Every As-Built Drawing Should Include
As-built drawings are only useful if they contain the necessary immediate information. Remember, as-built drawings and completion documents are used for record-keeping and to inform future renovations and maintenance. 

By including the following information, you can ensure that the final as-built drawings are as useful as possible, no matter who reviews them.

Original Design: As-built drawings should reflect the original specifications and provide a point of comparison between the as-built and designed.

• Changes: Any changes that occurred during construction, including modifications and additions, should be detailed in the as-built drawings.

• Dimensions: As-built drawings should include accurate dimensions of the space, as these are crucial for future renovations, maintenance, and record-keeping.

• Material Specifications: Include details of all materials used in the construction project, including material type, manufacturer, quality grade, etc.

• Location Information: Detail the location of as many elements as possible, including HVAC systems, load-bearing beams or structures, utilities, etc.

• Photos: Include photos of the completed project, as well as relevant photos documenting any changes made.

For as-built drawings, less is not more. When in doubt, add notes and details about changes, materials, etc. The last thing you want is uncertainty or questions about why specific revisions were made years later, when the information is no longer fresh in your mind.


👉 [
Related Article]: How Matterport Helps with Warehouse Planning? Notes, Tips, and Examples from Real Companies!
 
竣工圖注意事項



Who is Responsible for As-Built Drawings?

The person responsible for as-built drawings largely depends on the reason the drawings are needed and the type of construction. When a new structure is built, as-built drawings are typically completed by the architect or designer. If the project is a renovation, it is usually the general contractor or architect, depending on the scope of the renovation.

Regardless of who creates the documentation, as-built drawings offer many benefits to all construction-related roles.

• Architects: As-built drawings can serve as a reference point for future projects, allowing architects to gain a deeper understanding of future renovations and similar projects.

• Designers: Incomplete information can limit design and even compromise safety. As-built drawings provide designers with precise measurements and specifications, helping them make informed decisions without limiting design.

• Contractors: With as-built drawings before construction begins, contractors can properly plan the project and anticipate potential challenges in advance. This also allows contractors to purchase the correct materials beforehand and can even prevent safety issues.

• Building Owners/Managers: As-built drawings provide building managers with a more detailed understanding of their structures, allowing them to anticipate maintenance needs and budgets, and make more informed purchasing and sales decisions.

While correct as-built drawings can bring many role-specific benefits, they also play a larger role throughout the construction process.

The Importance of As-Built Drawings
Few places are as bustling and busy as a construction site, especially large projects involving dispersed teams. Regardless of one's role in a construction project, as-built drawings are important for many reasons.

More Effective Management and Maintenance of Portfolios
If you manage multiple properties, as-built drawings become invaluable for a variety of reasons.

As-built drawings provide you with detailed records of each building, allowing you to plan maintenance and maintenance budgets for each site. 

The detailed information provided by as-built drawings also gives you insight into the value of each building. This is useful for estimating the value of your portfolio and determining insurance coverage. These details can also help you determine which investments yield the best returns, what your annual costs might be, and which structures pose the greatest risks.

Accurate, Detailed Record Keeping
In short, as-built drawings are an extremely accurate and detailed record of a project. This brings various benefits, from helping diagnose maintenance issues to serving as proof of a project, to assisting with buying or selling, and much more.

Establishing a Reference for Maintenance and Repair Work
When it comes to building maintenance and repair, a little knowledge goes a long way. As-built drawings can help you diagnose problems, anticipate issues, and resolve them more effectively when they arise.

Suppose you have a power problem in your room. Without as-built drawings, you are left with only the original drawings (if any), which show where the utility box should be, but do not capture last-minute wiring changes. With accurate as-built drawings, you can quickly see these changes, while design documents would leave your maintenance team searching fruitlessly.

Using Them as a Starting Point for Planning and Executing Renovations
Like maintenance, renovations rely heavily on up-to-date information. As-built drawings clearly show the materials used, the location of load-bearing supports, etc. All of this can help you easily plan and execute renovations, reducing the likelihood of encountering unexpected challenges along the way.

For example, suppose you want to add new wall-mounted storage to a room. If substandard materials were replaced during the initial construction and not documented, you might end up damaging the wall and the new storage. Accurate as-built drawings prevent precisely this kind of confusion.

Helping Stakeholders Understand Modifications
Project stakeholders are not always on-site during construction, so unplanned changes can lead to unpleasant surprises.

As-built drawings with annotations can help stakeholders understand any unplanned changes. This understanding can reduce friction between workers and stakeholders and again demonstrate that everything is still built to standard.

Serving as a Reference Point for Communication and Collaboration

Communication and collaboration are crucial in the construction industry. If an unplanned change occurs on a job site one day, and different workers start working the next day – whether planned or unplanned – as-built drawings keep everyone informed.

The same applies to distributed teams and teams managing multiple job sites. By keeping as-built drawings as accessible as possible, you can ensure that all team members and stakeholders are on the same page, regardless of their location or what changes occur.

Reducing Risks Associated with Inaccuracies
Inaccurate information can lead to minor and catastrophic risks in construction. By keeping accurate as-built drawings, you ensure that everyone is equipped with the information they need to do their job – whether it's managing a building, dealing with maintenance, determining how to safely renovate a structure, etc.

Assisting with Government Compliance
States and nations can have different mandates for structures. These regulations can affect new construction and renovation projects, especially large buildings. Often, you need to obtain permits before breaking ground, but also provide proof afterward that the project was completed according to regulations. As-built drawings are excellent supplementary documentation that can be included and show any changes you made in accordance with all requirements.

👉 [Related Article]: Exterior Real Estate Scanning: Benefits, Challenges, and How to Get the Best Exterior Photos

Solving 3 Major As-Built Drawing Challenges
While as-built drawings exist to provide information and make projects easier, this is only true when they are completed as thoroughly as possible. Overcome the following as-built drawing challenges to ensure you provide your team with all possible information.

Incomplete Documentation
If you are creating as-built drawings, make sure to collect all the information you can. Ideally, you will be able to obtain this information from sources on the site. This may involve measuring spaces and interviewing experts who handled various aspects of the project.

If you cannot find the necessary people or access the information, make a note of this and set a reminder to follow up as soon as possible.

Lack of Coordination
Poor coordination between various teams can lead to miscommunication, inaccurate information, and failure to capture a high level of detail. Avoid this by setting communication protocols. Utilize digital communication channels such as instant messaging or video chat to ensure your team can share information quickly. Implement best practices and stakeholders for various processes to ensure people communicate the right message to the right person when milestones are reached.

Outdated Technology
When creating as-built drawings, outdated construction technology can lead to many problems. Manual measurements can be inaccurate and time-consuming, paper record-keeping makes collaboration difficult and increases the likelihood of using outdated information, and a lack of communication tools makes collaboration difficult.

Avoid this by solving old problems with modern solutions. For example, Matterport's measurement mode in digital twins allows any viewer to take measurements of a Matterport scan from anywhere, on any device. These scans can be done quickly and easily by anyone, meaning you can even get updated measurements daily. At the same time, instant messaging and video chat features make communication easier, while digital record-keeping helps you utilize the latest documents without the risk of easily losing records.


How Matterport Improves the As-Built Drawing Process
As-built drawings are only useful if they are accurate and complete, and doing this correctly can be a tedious manual process. David Kuoppamaki, owner of Kuop Design, states that using Matterport's digital twins significantly reduces manual measurement needs by 80%, shortens drawing time by 50%, eliminates the need for manual photography, and manages to improve bidding accuracy.

The Matterport Pro 3D panoramic scanner is a fast, simple way to capture spatial and photographic data of a property in minutes. It is significantly cheaper than traditional LIDAR scanning, costing only about 10% of LIDAR's price, and greatly simplifies the workflow.

In this video, Kuop Designs introduces their workflow:



Additional features such as the measurement mode marked in the virtual space itself and Matterport Notes improve collaboration by providing context for each space.

Matterport digital twins can also be converted into BIM (Building Information Model) and e57 files. Through e57 files, you can access richly detailed point clouds. With Procore and Autodesk integration, you can easily convert Matterport scans into as-built drawings. These capabilities ensure that everyone has the information needed for accurate as-built drawings, making it easy for distributed teams and multi-site groups to collaborate.

Alley Poyner Macchietto Architecture successfully streamlined their workflow and improved company efficiency by using Matterport's digital twins and color point clouds to create Revit models. This saved them countless hours on renovation projects and allowed them to see further gains in net new construction. Thanks to the as-built drawings and BIM documents provided by Matterport digital twins, Bayer Crop Science also saved 75% on engineering project planning costs.

As-built drawings can benefit your team in many ways, regardless of their role. Use Matterport to take the guesswork out of manual as-built drawings and see how you can provide everyone with the information they need when they need it.


As-Built Drawings FAQ

1. What is the difference between as-built drawings and construction drawings?
Construction drawings are drawn before a project begins or is completed, while as-built drawings are typically drawn after a project is completed.

2. What is the difference between as-built drawings and record drawings?
Record drawings are usually approved by the architect and follow as-built drawings. As-built drawings are typically drawn after a project is completed, but may not be as concise as record drawings.

3. What are the steps in the as-built drawing process?
To create as-built drawings, you typically start by reviewing the original design specifications, noting any changes that occurred during construction, and then drafting a more refined set of drawings.


Choose Pro3 for unprecedented scanning speed, resulting in significant cost savings and increased productivity
Create As-Built BIM and CAD Models Quickly and Confidently with Matterport


In the evolving field of architecture and construction design, professionals are constantly seeking tools that offer precision, speed, and efficiency. The Matterport Pro3 camera is one such groundbreaking tool that is making waves in the industry. This innovative device sets a new standard in 3D scanning, especially for creating as-built Building Information Models (BIM) or Computer-Aided Design (CAD) models. In this article, we will delve into how the Matterport Pro3's exceptional scanning speed not only saves time but also contributes to faster and more confident model creation.

The Advantages of Matterport Pro3

Unprecedented Speed The Matterport Pro3 boasts remarkable scanning speed, with each scan taking <20 seconds. Traditional laser scanners can be slow or unpredictable in varying weather conditions such as low light or strong winds. Relying solely on traditional survey scanners means that capturing on-site data can be cumbersome, time-consuming, and often requires multiple site visits. With the Pro3's extended scanning range of up to 100m1 and reliable performance in all lighting conditions, you can capture spaces faster than ever before, reducing working hours to minutes.

Seamless Integration with BIM and CAD Time savings are not only reflected in scanning. Matterport Pro3 scans can be directly converted into as-built BIM or CAD models using the Matterport Revit plugin, making the transition from scanned data to usable models smoother and faster. This seamless integration minimizes the need for extensive post-processing, ensuring faster project turnaround times. Commercial subscription plans also include integration with Autodesk Construction Cloud and Procore. 

High Accuracy Ensures Confidence The Matterport Pro3's speed does not come at the expense of accuracy. The camera's high-resolution capture capabilities ensure that every detail, no matter how small, is precisely recorded. This high accuracy means that architects, engineers, and construction professionals can confidently use this data to create models, knowing that what is represented is true. The Pro3 is ideal for rendering large projects with high accuracy (+/- 20mm @10m) and for creating high-fidelity digital twins (100K points per second).

Comprehensive Scans Minimize Site Visits Due to its speed and comprehensive capture capabilities, the Pro3 often eliminates the need for multiple site visits. In addition, the Pro3 also includes a rechargeable battery pack, which not only saves travel and setup time but also reduces the costs associated with repeat visits.

👉 [Related Article]: Matterport Pro3 Quick Start Guide Tutorial

The Future of Design and Construction

As industries continue to embrace digital transformation, tools that offer both speed and precision are invaluable. The ability to quickly capture real-world sites and convert them into digital as-built BIM or CAD models has profound implications:

Enhanced Collaboration: When teams can quickly access accurate site data, they can collaborate more effectively.

Informed Decisions: With faster access to accurate models, professionals can make more informed decisions earlier in the project lifecycle.

Reduced Rework: Errors resulting from inaccurate site data can lead to costly rework. Quick access to precise data minimizes such risks.

In an industry where time often equals money, the speed and efficiency offered by the Matterport Pro3 make it an indispensable tool for modern professionals. As we continue to push the boundaries of design, construction, and architectural spaces, tools like the Pro3 ensure that we achieve this with confidence, accuracy, and efficiency.

Whether you are an architect looking to create detailed as-built models or a construction professional aiming for smooth project execution, adopting the Matterport Pro3's fast scanning capabilities can be a game-changer for you.

 1Normal range is 20m, extended range only available in e57 files



👉 Click here to view the main features of Matterport Pro3

Want to learn more about Matterport products? Click below to contact us!

Contact Us -


3DMart offers more than just 3D printing; we provide three major outsourcing services: "3D Printing Services", "3D Scanning Services", and "3D Spatial Scanning Services"!!

Follow our fan page to stay updated:
Facebook | Instagram | LinkedIn


Reference 1
Reference 2